PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing copper piping at the 1st floor Facing South.jpg Patching the shear walls Stair -2-Elev. 4 (South Elevation).jpg Copper piping at the 3rd floor bathroom Facing North.jpg Installed metal furring at 2nd floor Elev. 5,6 Shear wall Facing North-East.jpg Installed sheathing around the perimeter of the low roof Facing North-West.jpg Installing copper piping at the 2nd floor bathrooms.jpg Installing copper piping at the 3rd floor bathrooms Facing West.jpg
Previous pageNext page Copper piping at the 3rd floor bathroom Facing North
Copper piping at the 3rd floor bathroom Facing North